A “Perfect Storm” for AEC Industry Transformation

By Akio
Share on LinkedInTweet about this on TwitterShare on FacebookShare on Google+

shutterstock_122817211

Click to TweetClick to Tweet: A “Perfect Storm”
for #AEC Industry Transformation

It’s no secret that the AEC industry is suffering from a surplus of waste: wasted materials, wasted time spent on rework and change orders, waste from highly fragmented processes.

However, what the industry is beginning to realize is that it’s not the first group to think, There must be a better way.

The aerospace industry is one recent example; in the 1990s, companies such as Boeing began to look at technologies and processes used in other industries to tighten their supply chain and manufacturing processes. A switch to all-digital modeling made this possible.

Also necessary was a switch in mindset. Aerospace professionals had to switch their thinking from “project” to “product,” and adopt product lifecycle management tools that would deliver increased value to the end-user.

With these 2 steps, AEC professionals can likewise optimize their processes:

Step 1. Adopting Revised Business Models

According to Hector Lorenzo Camps, founder of PHI Cubed Inc., the industry is looking for ways to improve, but to truly move forward will first have to revise its compensation and business models.

Click to TweetClick to Tweet: “To move forward, #AEC industry
1st must revise its comp & business models” @HectorCamps

Although design-build contracts are increasingly popular, there remains too little true partnership among all parties involved in the design, construction and operations processes.

Today’s typical contracts emphasize distinct roles for all players in order to help control liability.

“Many relationships in the industry are strained because of the adversarial nature of the industry standard contracts that pin professionals against each other to divide risk,” Camps says.

New collaborative forms of agreement—namely, Integrated Project Delivery—remain slow to take off as AEC professionals explore new liability rules and shift from a “best for me” to a “best for project” mentality.

Click to TweetClick to Tweet: #AEC is shifting (slowly) from
“best for me” to “best for project” mentality.

Tied to this need to collaborate is another necessary step for AEC professionals: the need to shake their reliance on a 2D, paper-based management process.

Step 2. Adopting Tools for Better Integration

Until all industry players make the switch to 3D processes, there will be a problem with what Camps calls “two versions of the truth with documentation, one in 2D and the other in 3D.”

Many firms are working with a mix of 2D CAD and 3D BIM to accommodate all parties’ preferences.

“Contractually, firms go with the 2D documents, which often are obsolete and predate the model. Builders under pressure, wanting to build from the best available data, are asking to build from the model and produce 2D documents after,” Camps says. “The coordinated model needs to drive the dimensional and informational control of the project and the field implementation documents. The contractual language needs to reflect this.”

Camps believes owners—who ultimately stand to gain the most from collaborative projects—will drive this evolution to 3D.

“All they need to do is write into their contracts the information management strategy. As long as the roles, responsibilities and use case for information are defined, and intellectual property is dealt with, they should have no problem getting professionals to deliver digital documents,” he says.

Why Now Is The Time For Change

The good news? The AEC industry is already beginning to adopt the tools and processes that will make transformation possible.

“We have the perfect storm for real industry transformation as significant as the industrial revolution,” Camps predicts.

Click to TweetClick to Tweet: .@HectorCamps predicts a “perfect storm
for #AEC transformation as significant as #IndustrialRevolution”

First, AEC professionals are beginning to borrow concepts from manufacturing. To further reduce waste and improve quality, the industry is looking to close the gap between design and fabrication. Lean construction is one such effort, as the industry attacks waste by taking lessons learned from Lean Manufacturing and Just in Time delivery models.

Second, Camps points to a number of technology solutions becoming available that may further speed improvement.

For example, the advent of cloud computing is making it easier than ever for all players to work together in a more tightly connected process.

As Camps points out, AEC companies generally have far fewer employees than manufacturing industries, making it potentially more difficult to invest in an expensive data management system. Cloud computing can allow even small firms to participate in building lifecycle management without having to invest in prohibitively expensive data management systems.

Click to TweetClick to Tweet: Cloud computing allows small firms to
participate in #BLM without investing in expensive systems

By putting data on the cloud, it’s also typically easier for various parties to share data and resources related to a project.

“This ad hoc approach to PLM makes it very easy for the AEC industry to adopt the benefits of integration and collaboration without all the forward structuring that would happen if they had to form a unique corporation in order to integrate their processes,” Camps says.

In addition, the Internet of Things is making it easier to move digital models from the drawing table to the field, giving contractors and designers rapid insight into potential problems. And Camps even points to rapid manufacturing, such as 3D printing, as a potentially promising technology for optimization, as these tools could someday make it possible to produce one off building components while maintaining the economies of scale of standard offsite production facilities.

Beyond technology, however, today’s growing engagement from public owners looking to spend more wisely is invigorating further innovation in connectedness.

The most carefully watched case in point is the UK’s Level 2 BIM requirement for federal buildings, set to become effective in 2016.

“It’s expected that by 2019, BIM Level 3 will be required. Level 3 in essence is ‘full collaboration between all disciplines by means of using a single, shared project model which is held in a centralized repository,’” Camps says.

He adds, “By that definition, they just described the 3DEXPERIENCE Platform.”

Related Resources

Collaborative, Industrialized Construction Solutions from Dassault Systèmes

Spotlight on PHI Cubed: Guiding the AEC Industry Toward Greater Levels of Integration

Spotlight on MEMKO: Pushing Collaboration Across the Project Life Cycle to Revolutionize Design and Construction

Spotlight on Impararia: Reducing the Gap Between Aerospace Optimization and AEC Inefficiency

Shanghai Foundation Engineering Group Brings Information-Based Approach to Civil Engineering Projects

By Akio
Share on LinkedInTweet about this on TwitterShare on FacebookShare on Google+

Click to TweetClick to Tweet: “Shanghai Foundation Engineering Group
brings info-based approach to #CivilEngineering”

Shanghai Foundation Engineering Group has implemented “advanced construction process simulation methods” with the Optimized Planning Industry Process Experience.

Shanghai Foundation Engineering Group is a wholly-owned subsidiary of the Shanghai Construction Group. The firm has 1,680 employees and is focused on foundation engineering, constructing harbors, bridges, tunnels, and other large structures.

Highly regarded through the construction industry globally, Shanghai Construction Group has built a large number of important, iconic and award-winning projects, all using the latest technologies. To ensure leadership in professional construction technology, the company and its subsidiaries are committed to the pursuit of excellence, continuous innovation in research and development, and rigorous project and process management approaches.

Shanghai Foundation Engineering Group conducts a wide range of business activities and face many challenges in the execution of the firm’s construction projects.

“There have been no successful examples of combining information in the civil engineering industry. We hope to instigate our new information-based approach to improve the integration of our stakeholders and increase project management efficiency,” says Yu Zhendong, BIM Institute Director, Shanghai Foundation Engineering Group, Co. Ltd.

Click to TweetClick to Tweet: “SFEG applies data-driven solution to #civilengineering
projects to improve stakeholder integration & efficiency”

Chenta Bridge Project

Photo Credit: Yang Hui/Global Times

(Construction workers complete the last plat for the Chenta Bridge.
Photo credit: Yang Hui/Global Times)

Using advanced methods, Shanghai Foundation Engineering Group constructed the Chenta Bridge. This was an extremely challenging project, with high complexity and a need for integration among stakeholders and schedules. It led the firm to adopt the Dassault Systèmes 3DEXPERIENCE platform.

The entire construction process of the Chenta Bridge was implemented in advance through simulations. The team used CATIA to model the entire bridge, based on CATIA design template and parametric modeling.

Click to TweetClick to Tweet: “The entire #ChentaBridge
construction process was simulated in advance”

Watch this video to learn more about Shanghai Foundation Engineering Group’s Chenta Bridge project:


Shanghai Foundation Engineering Group created a framework-driven concept, using actual measured data as inputs to update the model. This way, the digital models would be exactly as same as the real product, based on data obtained from actual onsite measurements.

Identify Potential Risks Early

Comparing the actual model with the original design model allowed them to detect potential risks visually, early in the process.

Click to TweetClick to Tweet: “Comparing construction #simulation to
original model = potential risks detected early in process”

They included all of the critical construction equipment in the model. For example, the scaffolding on the main tower and the cradle platforms. Throughout this process, the equipment, the scene layout, and the design structure were closely linked and interconnected, providing a comprehensive view of this complex project.

“This is one of the main benefits of using Optimized Planning Industry Process Experience,” adds Zhendong. “It allowed us to create a full simulation of the entire construction scheme. It made the entire process more intuitive. From a long-term perspective, the 3D information database management deeply integrated within our projects greatly benefits our entire project management process.”

Click to TweetClick to Tweet: “#OptimizedPlanning creates full simulation
of construction scheme, benefits entire #PM process”

Related Resources

Optimized Planning Industry Process Experience

Collaborative and Industrialized Construction from Dassault Systèmes

Shanghai Foundation Engineering Group

Spotlight on Lionel Lambourn of Syntegrate: Looking Beyond BIM to Improve Construction Efficiencies

By Akio
Share on LinkedInTweet about this on TwitterShare on FacebookShare on Google+
4screen

Admiralty Station, Hong Kong

Lionel Lambourn, director of Syntegrate, first gained familiarity with the possibilities afforded by BIM during his studies at the Southern California Institute of Architecture, before putting those possibilities to use at Gehry Technologies. During his tenure there, he helped set up the company’s Middle Eastern branches, using BIM tools in real-world applications.

Lionel L. Lambourn, Director, Syntegrate

Lionel L. Lambourn, Director, Syntegrate

It was that firsthand exposure to the ways that technology can boost efficiency in the construction process that led Lambourn to launch Syntegrate. The consultancy’s name was coined to describe the company’s focus on “synthesizing disciplines and integrating technologies.”

Why integrated technologies? As Lambourn quite simply explains, construction is a highly integrated discipline. It requires the work and knowledge of multiple disciplines to create something so complicated as a building, but it’s often at the intersection of trades where problems arise.

Today’s advanced software technology can easily be leveraged to ease the coordination required among building professionals and smooth the transitions of trades and materials.

Click to TweetClick to Tweet: “#Construction requires multiple disciplines;
problems arise at intersection of trades”

“In this day and age I see integration of technology as the best way to address some of the accepted, in-built assortments of waste and inefficiency in the construction industry,” Lambourn says. “Our mission at Syntegrate is to leverage technology to realize our built environment more appropriately, more efficiently and more sustainably.”

An Environment of Waste

Waste and inefficiency, Lambourn says, are the single biggest challenges faced today by the architecture, engineering and construction industry.

“I believe waste and inefficiency overwhelm all the other issues and encapsulate all the challenges that we face in the industry,” he says. He offers an example to put this into perspective:

“By some reports, worldwide construction and buildings consume 40 percent of the world’s energy. However, we can conservatively estimate from available data that 20 percent of construction ends up as waste. To make these numbers more tangible, let’s put these numbers in the context of national GDP—worldwide construction is comparable to the size of China’s economy and each year the entire output of Spain is wasted.”

Click to TweetClick to Tweet: 20% of #construction ends up as waste.
How can we do better?

Lambourn sees much of this waste and inefficiency could be solved by better coordination among contractors — a collaboration that could be easily facilitated by the integration of technology such as BIM.

A Tool for Coordination and Visualization

download

Admiralty Station, Hong Kong

Lambourn offers as a case in point Syntegrate’s work on the Admiralty Station, part of the South Island Line (East) Project, which will become the first four line interchange in Hong Kong.

The ongoing underground excavation and building work, which poses its own inherent risks, is being undertaken adjacent to the existing Island Line and Tsuen Wan Line, and the busy existing Admiralty Station – all within a densely populated area with many other underground structures in close proximity.

MTR Corporation, the owner of the project, recognizes the return on investment that they stand to gain from the comprehensive implementation of BIM on their many Projects, from construction through to operation.

The general contractor on the integrated Admiralty Station—a joint venture of Kier, Laing O’Rourke and Kaden (KLKJV)—were early adopters of BIM technology and are certainly at the forefront of the global construction industry in the implementation of BIM on their projects.

For Admiralty, the joint venture has chosen Dassault Systèmes’ 3DEXPERIENCE Platform as their BIM platform. Syntegrate works closely with the joint venture to refine its construction sequencing, from the coordination of excavation to concrete pours to formwork erection. By carefully scheduling each step, the general contractor has been able to execute each phase of this highly complex project with minimal rework, which in turn reduces schedule delays.

Moreover, the solution provides the joint venture with a visualization of the complicated underpinning work required to support the existing rail lines and platforms which remain in operation throughout construction.

Repeated simulations of the onsite work helps the construction team to effectively “practice” and perfect its planning, Lambourn says, so that when workers move onsite they are able to perform their work correctly the first time. This allows the joint venture to realize a dramatic reduction in waste of time and materials.

rebar.junction

Admiralty Station Rebar Junction

Broadening Technology Solutions

As projects become more complex, Lambourn believes that the use of BIM technology is a strong first step toward improving the collaboration of architecture, engineering and construction professionals. And he sees many opportunities to bring other technologies to bear, especially given the pace at which new technological advancements are happening.

“These days, we need to broaden our focus of technology to consider technologies such as 3D laser scanning, 3D printing, and even the use of drone technology to improve the way that a building is delivered,” Lambourn adds.

Click to TweetClick to Tweet: “We need to broaden our focus of
#technology for #AEC”

On the Admiralty contract, KLKJV utilizes 3D laser scanning extensively to capture the as-built conditions of the tunneling works at a level of precision that was not available several years ago and that is unachievable by orthodox survey methods.

“When the laser scan is introduced into the BIM platform, we can determine, exactly, how much over-break (excess excavation) has occurred and where any areas of under-break (insufficient excavation) exist. By repeated laser scanning as they proceed, the joint venture can optimize their works so that they achieve just the right amount of over-break with no areas of under-break, ensuring the highest levels of construction quality.”

Using integrated technology is but one solution to what Lambourn sees as a two-pronged approach to solving construction inefficiency.

Realistically, Lambourn says, “We would be naïve to think that the industry alone could tackle such a large problem of waste and inefficiency. Something like that has to come not only from the industry but also from a governmental level.”

Lambourn suggests that governments may need to step in to reward the reduction of waste and efficiency, ensuring this becomes a market factor that the industry must build into the way it does business.

Case in point: Lambourn notes that the industry still relies heavily on the delivery of 2D, paper drawings for contractual permissions.

“A building could be done completely paperless and much more efficiently through a 3D environment. However, governments need to come to the table and recognize that, and change the way that the legislation around the procurement of buildings is formulated so that there is not a real and contractual reliance on paper drawings.”

That doesn’t mean that architecture, engineering and construction practitioners should sit back and wait for governments to do something, however.

By becoming involved with organizations promoting and standardizing the use of BIM, the industry can help determine future technology requirements. Lambourn expects governments initiatives will spread more widely.

For example, the UK government has committed to what they call a “Level 2” BIM implementation by the year 2016 and several months ago, the strategic plan for “Level 3” BIM implementation was released under the title of “Digital Built Britain.”

Click to TweetClick to Tweet: Lionel Lambourn of Syntegrate:
Looking Beyond #BIM to Improve #Construction Efficiencies